Green Line
Ahmedabad • 4 stations • 28.3 km
Length
28.3 km
Stations
4
Max Speed
80 km/h
End to End
~15 min
Direction
NW-SE
Line Details
- Rolling Stock
- Hyundai Rotem
- Depot
- Gyaspur
- Opening Phases
- 2026: Under Construction
Stations
~5 min between stations
1
SP Ring Road
OriginSP Ring Road
—
2
Vastral Gam
Vastral Gam
5 min
3
Nikol
Nikol
10 min
4
Naroda
TerminusNaroda
15 min
SP Ring Road (NW) to Naroda (SE)