Green Line

Bangalore27 stations • 33.46 km

Length

33.46 km

Stations

27

Max Speed

80 km/h

End to End

~65 min

Direction

N-S

Line Details

Rolling Stock
BMRCL (BEML)
Depot
Peenya
Opening Phases
2014: Nagasandra to Sampige Road
2015: Sampige Road to National College
2021: Hesaraghatta Cross to Nagasandra
2024: Silk Institute to Madavara

Stations

~2.5 min between stations
Madavara (N) to Yelachenahalli (S)